Hello all,
it's 22th of January and in 6days my studies project must be finished.
I want to share with you the next 6 days as u can see the progress
D1.
What we have atm ?
Revit model is almost finished,
it's ~ 70% done atm.
Ground floor and other are almost finished.
Sections are almost done.
I want to import model to 3dsmax soon and then make some details as in Revit
it's more time consuming.
Main idea is to make external walls to look heavy, cold, stone.
Internal walls are glass. ( with outside metal construction ).
I hope i will have enough time to take 2 shots,
one from inside of patio with kids playing with their parents and one from outside to show those
stone elevations and some shops on ground floor.
so, let me give you a look
it would me located here
https://maps.google.pl/maps?q=rynek+...zowieckie&z=19
D2.
Ok, floor 1,2,3 and 4 are ready for print
I am preparing elevations.
Because I have not enough time to make whole 3dsmax model I'm doing it in Photoshop.
here is WIP
I was also sketching some 3d shots but I'll post it later.


2Likes
LinkBack URL
About LinkBacks










Reply With Quote

Bookmarks